大小单双平台

  • <tr id='dCtRmx'><strong id='dCtRmx'></strong><small id='dCtRmx'></small><button id='dCtRmx'></button><li id='dCtRmx'><noscript id='dCtRmx'><big id='dCtRmx'></big><dt id='dCtRmx'></dt></noscript></li></tr><ol id='dCtRmx'><option id='dCtRmx'><table id='dCtRmx'><blockquote id='dCtRmx'><tbody id='dCtRmx'></tbody></blockquote></table></option></ol><u id='dCtRmx'></u><kbd id='dCtRmx'><kbd id='dCtRmx'></kbd></kbd>

    <code id='dCtRmx'><strong id='dCtRmx'></strong></code>

    <fieldset id='dCtRmx'></fieldset>
          <span id='dCtRmx'></span>

              <ins id='dCtRmx'></ins>
              <acronym id='dCtRmx'><em id='dCtRmx'></em><td id='dCtRmx'><div id='dCtRmx'></div></td></acronym><address id='dCtRmx'><big id='dCtRmx'><big id='dCtRmx'></big><legend id='dCtRmx'></legend></big></address>

              <i id='dCtRmx'><div id='dCtRmx'><ins id='dCtRmx'></ins></div></i>
              <i id='dCtRmx'></i>
            1. <dl id='dCtRmx'></dl>
              1. <blockquote id='dCtRmx'><q id='dCtRmx'><noscript id='dCtRmx'></noscript><dt id='dCtRmx'></dt></q></blockquote><noframes id='dCtRmx'><i id='dCtRmx'></i>

                什么是EPC模式

                分享到:
                点击次数:2615 更新时间:2017年03月14日08:24:15 打印此页 关闭
                什么EPC模式
                “EPC”是“设计、采购、施工”的三个英文单词第一个英文字母的缩写(Engineering、Procurement、Construction)。EPC总承包模式是指建设单位作为业主将建设工程发包给总承包单位,由总承包︼单位承揽整个建设工程的设计、采购、施工,并对所承包的建设工程的质量、安全、工期、造价等全面负责,最终向建√设单位提交一个符合合同约定、满足使用功◢能、具备使用条件并经竣工验收合格的建设工程承包模式。EPC总承包模式是当前国际工程承ξ包中一种被普遍采用的承包模式,也是在当前国内建筑市场中被◥我国政府和我国现行《建筑法》积极倡导、推广Ψ的一种承包模式。这种承包模式已经开始在包括房地产开发、大型市政基础设施建设等在内的国内建筑市场中被∑采用。
                较传统承包模式而言,EPC总承包模式具有以下三个方面基本优势:
                (一)强调和充分发挥设计在整◣个工程建设过程中↑的主导作用。对设计在整个工程建设过程中的主导作用的强调和发挥,有利∞于工程项目建设整体方案的不断优化。
                (二)有效克服设计☆、采购、施◆工相互制约和相互脱节的矛盾,有利于设计、采购、施工各阶段工作的※合理衔接,有效地实现建设项目的进度、成本和质量控制符合建设工程承包合同约定,确保获得较好的投资效益。
                (三)建设工程质量责任主体明确,有利于追究工程质量责任和确定工程质量责任的承担★人。